
The first element of the Fehmarn Belt Tunnel between Germany and Denmark could be lowered off the Danish island of Lolland as early as this spring, Danish state-owned construction company Sund & Bælt said on Thursday.
A special vessel that is to sink the tunnel elements has been approved by the Danish Maritime Authority, the company said.
The ship's task was "complex, so numerous tests were necessary," deputy contract director Lasse Vester said in the statement. "Now we have received approval for the ship and can start lowering it."
The construction consortium Femern Link Contractors (FLC) can now begin the necessary preparations, it said.
In January, Sund & Bælt said the opening of the 18-kilometre tunnel was likely to be delayed until 2031, partly because of missing permits. Once the first tunnel elements have been sunk, a new timetable will be drawn up, it had now said.
Huge infrastructure project
According to Sund & Bælt, the Fehmarnbelt Tunnel for cars and trains is one of Europe's largest infrastructure projects. It will eventually connect the German island of Fehmarn with the Danish island of Lolland.
On the German side, a hinterland connection is being built that also includes the Fehmarn Sound Tunnel between the island and the German mainland.
China Just Got A Lot Closer To Its First-Ever Manned Moon Landing
Red Sea arena: Yemen’s Houthis open fourth front in Iran war, with global implications
Which Diet Prompts the Incomparable Wellbeing Results?
Figure out How to Modify Your Pre-assembled Home for Greatest Solace and Stylish Allure
AI is making spacecraft propulsion more efficient – and could even lead to nuclear-powered rockets
China Just Got Another Cheap EV America Would Love to Have
Congo declares its latest Ebola outbreak over, after 43 deaths
Step by step instructions to Protect Your Senior Condo for Ideal Wellbeing and Solace
Pilot captures jaw-dropping northern lights show from 36,000 feet (photos)











